Voltcom International Philippines are the International Supply team that supports Voltcom Group’s resourcing demand, whilst using its significant sector experience to export teams in Support of Global Capital projects where skilled UK-trained professionals can work in support of Principal contractors to deliver large programs. Teams can be trained in the following:


Self-contained integral crews

  • · Bespoke overhead Transmission Line Expert Supervisors;
  • · Overhead distribution line skill specific Supervisors;
  • · Extra High voltage (EHV) skill specific Supervisors;
  • · Senior Authorised Persons for outage management,
  • · Project management
  • · Site health and safety management and CDM (Construction Design Management)
  • · QC consultants.


Complete trained manpower Labour provision:

  • · Steel Tower Erection by Crane
  • · Steel tower erection by Gin Pole (Derrick & Winch).
  • · Heavy Duty Wood pole Erection – New Build, Refurbishment & Rebuild
  • · ESQC Regulations Compliance
  • · Underground Network Services
  • · Earthing Renewal
  • · Reinstatement
  • · Overhead line survey and conditioning reporting, technical appraisal, risk analysis
  • · Design
  • · Quantity Surveying

Voltcom Construction operates as principal contractor under the requirements of CDM Regulations

 

Features

Voltcom International Philippines provides full project management, route evaluation, feasibility, access consents, circuit installation for the rebuild and refurbishment of overhead lines at all voltages.

·        All aspects of stringing including, pilot stringing;

·        Insulator erection;

·        Conductor earth wire pulling;

·        OPGW installation;

·        Clamping of conductors & earth wires;

·        Fitting of conductor spacers:

·        Fitting of Arial warning spheres;

·        Re-conductoring, including sagging of conductors and earth wires;

·        Above ground Arial Platform Back Hanging-Deadening and Jumper installation;

·        Helicopter support Operations.

Latest News

Cardiff based construction firm Voltcom Construction, has been awarded a reconfiguration project by Scottish Power Energy Networks in North Wales that will require design, project management and construction services. The network reconfiguration will involve the removal and replacement of steel lattice towers and will enhance flexibility of the network supporting the North Wales area. Voltcom […]

Voltcom Construction Limited have enhanced their delivery team in Northern England with the recent appointments of Gavin Kington and Chris Lunn. Gavin & Chris bring a combined fifty years of Power Transmission and Distribution construction experience to Voltcom and will work with operational delivery teams from Doncaster. With specific experience in the construction of steel […]

Cardiff based construction firm Voltcom Construction, have been awarded a new build project for the construction of a heavy duty wood pole connection in Scotland by SP Energy Networks. The connection will span 16km between Ewe Hill and Gretna and involve the design, project management and construction of 180 wood pole structures, Phase Conductor and […]

Cardiff based construction firm Voltcom, have recently secured a four year framework with Scottish Power Energy Networks servicing the Low Voltage to 33kV Overhead Line Network in the Dee Valley and Oswestry region of Mid Wales. SP Energy Networks awarded the four-year framework as part of their Electricity Distribution Business Plans submitted to Ofgem in […]